Well I am finally up to date with my farmwork. That is one BIG weight off my shoulders. Now I am also getting on top of the house with flylady's help. the kitchen is clean and the washing is on the line.
The family is happy.
I am also up to the edging on my shawl. This mystery shawl has been fantastic. I have about 1/4 of the edging done. I am doing a repeat (10 rows) everytime I stop for a cuppa. So I get about 4 done a day. My deadline is for this wednesday, as I want to wear it to my knitting group.
Just to give my hands a break from the 2ply and 4mm needles I have knitted two hats from the 2006 knitting calender. I have used my handspun doubled. Very thick. This has knitted up to a finished hat in about 4 hours. This is one Xmas present done.
Off I go to knit some more edging.
Subscribe to:
Post Comments (Atom)
1 comment:
im slowly ploughing thru the edging on the ms2 .. about a 1/3 of the way .. still got lots to do .im sure once i get to half way it will fly off the needles .??
Post a Comment